Train
corse |
Calvi, Wednesday 11 July 2001. At about 1 km of Calvi station, the track passes over a rivulet, often dry, in front of Pinéa building. This bridge was replaced by a concrete one in 2004 when the beach track was renewed. In 2001 it was a big double iron girder with the sleepers directly on it. It was fitted in 1969. A Matisa engine is coming over the bridge. At this moment and since a few years, the track was slightly curved before the bridge on Calvi side |