Train
corse |
Calvi, Thursday 29 July 2004. At about 1 km of Calvi station, the track passes over a rivulet, often dry, in front of Pinéa buildings. This bridge was replaced by a concrete one at the end of 2004 when the beach track was renewed. Before it was a big double iron girder with the sleepers directly on it. It was fitted in 1969. |